ABOUT PARENT COMPANIES
·
LARSEN & TOUBRO LIMITED, India
(L&T)
L&T
has been providing comprehensive Engineering, Procurement,
Construction and Commissioning (EPCC)
services for pipeline projects in India & overseas, with
operating centers across the GCC countries and Malaysia.
Among other achievements, L&T has built & commissioned
the world's longest LPG pipeline from
Jamnagar in the state of Gujarat to Loni in the state of
Uttar Pradesh, in India. Thereafter, L&T has laid so many
Pipeline projects on EPC basis. As on date, L&T has
completed more than 3000 Km. of cross country pipelines. L&T
has completed projects under various terrains, viz. marshy
land, paddy fields / cultivated lands, water logged areas,
gravel filled land, rocky area (weathered, soft & hard),
deserts / sandy area, reserve & dense forest areas, Land
Fall point and shore approach.
L&T’s
design and engineering capability includes over 2000
qualified and experienced engineers from various disciplines
located at its engineering centers in Delhi NCR (Faridabad),
Mumbai, Bangalore, Chennai, Vadodara, Kolkata, and Sharjah (UAE).
More information can be seen
from
www.Larsentoubro.com &
www.Lntenc.com
·
GULF
INTERSTATE ENGINEERING COMPANY, U.S.A (GIE)
GULF
Interstate Engineering,
Based in Houston, Texas, USA
has served the
energy industry since 1953, providing quality project
management services to the oil & gas industry worldwide.
GIE, specializes in the management and engineering of
pipeline systems, a focus that covers onshore and offshore
pipelines, gathering systems, production facilities, pump
and compressor stations, storage terminals and loading
facilities and is ranked number
two among pipeline design companies worldwide, by
Engineering News Record (ENR) 2007.
GIE
is ranked #92 among the top 500
design firms published by Engineering News-Record's (ENR)
"Top 500 Design Firms" in 2008.
GIE’s
experience and capabilities encompass all aspects of oil and
gas production from the well head to the export terminal.
GIE has completed projects all over the world under some
of the harshest conditions (e.g. temp - 400C to
+500C) that nature offers, from the icy expanse
of Alaska to the searing desert heat of the Middle East.
GIE has successfully executed and participated in oil
and gas projects characterized by the most complex
logistics. In the past ten years, GIE has managed the
implementation of projects having a combined capital cost in
excess of $6.0 billion. GIE
designs large diameter pipelines for extreme conditions and
is currently active in the USA, Mexico, South America,
Russia and the Middle East.
GIE
has so far engineered successfully
·
Pipeline
Systems -
150,000 km
·
Production & Processing Facilities
- 2,000,000 BPD
·
Pumping Stations
- 400,000 HP
·
Compressor Stations
- 5,000,000 HP
More
information can be obtained from website
www.GIE.com |